Hall information
Studying the information about each hall will help you prepare and save you time during installation! Under each hall description you will find a link to the relevant hall drawing.
Hall A
From floor to ceiling
The asphalt floor, painted grey, can withstand a maximum load of 2,000 kp/m2. In the newly built part, to the left of cargo bay PA12 on the drawing below, there is another maximum load. Please contact Event Services, eventservice@stockholmsmassan.se, for more information. The ceiling has two levels. The highest point of the "high section" is 16.0 m, while the ceiling height varies in the rest of the hall from a minimum of 7.2 m to a maximum of 9.6 m. Along the hall's walls, the ceiling height can be significantly lower. The hall has 30 supporting pillars.
Power and water, heating and sanitation
Connections for water, drainage, compressed air and power points are via service channels in the floor. The position of the service channels is normally indicated by two dotted lines on the drawing of the proposed position. Make use of the service channels when planning your stand to avoid troublesome running of pipes and cables on the floor.
Transportation
Transport and deliveries are directed to gates PA1-PA18. You can see the dimensions of the gates below. Security guards or transport personnel at Goods Inwards can help direct you to the correct gate.
Transportation gate dimensions
Transportation gate dimensions:
PA1 6,95 x 6,00 PA10 4,20 x 5,05
PA2 4,20 x 4,95 PA11 4,20 x 3,05
PA3 4,20 x 3,05 PA12 6,20 x 6,80
PA4 4,20 x 3,05 PA13 4,00 x 4,80
PA5 4,20 x 5,20 PA14 2,10 x 2,20
PA6 4,20 x 3,05 PA15 2,10 x 2,20
PA7 4,20 x 4,95 PA16 2,10 x 2,20
PA8 4,20 x 2,85 PA17 6,00 x 6,90
PA9 4,20 x 4,95 PA18 3,60 x 4,75
Link to hall drawing, Hall A
Hall B
The sections of Hall B
Hall B is divided into three sections: BA, BB and BC. These sections have different technical data which is reported for each section. There is a higher number of pillars between the sections. For detailed information on these pillars, please contact Event Services, tel. +46 (0)8-749 44 44.
BA
From floor to ceiling
The asphalt floor, painted grey, can withstand a maximum load of 1,000 kp/m2. The ceiling height is 10.1 m at its highest point and 9.1 m at its lowest point. Along the hall's walls, the ceiling height can be significantly lower. The hall has 4 supporting pillars.
Electricity and water, heating and sanitation
Connections for water, drainage, compressed air and power points are via service channels in the floor. The position of the service channels is normally indicated by two dotted lines on the drawing of the proposed position.
Transportation
Transport and deliveries are directed to gates PB1 and PB2. Security guards or transport personnel at Goods Inwards can help direct you to the correct gate.
BB
From floor to ceiling
The asphalt floor, painted grey, can withstand a maximum load of 1,000 kp/m2. The ceiling height is 9.1 m at its highest point and 6.7 m at its lowest point. Along the hall's walls, the ceiling height can be significantly lower. The hall has 10 supporting pillars.
Electricity and water, heating and sanitation
Connections for water, drainage, compressed air and power points are via service channels in the floor. The position of the service channels is normally indicated by two dotted lines on the drawing of the proposed position.
Transportation
Transport and deliveries are directed to gates PB3-PB6. Security guards or transport personnel at Goods Inwards can help direct you to the correct gate.
BC
From floor to ceiling
The concrete floor, painted grey, can withstand a maximum load of 1,000 kp/m2. The ceiling height is 5.1 m. Along the hall's walls, the ceiling height can be significantly lower. The hall has 17 supporting pillars.
Electricity and water, heating and sanitation
Connections for water, drainage, compressed air and power points are via the pillars. Make use of the pillars when planning your stand to avoid troublesome running of pipes and cables on the floor.
Transportation
Transport and deliveries are directed to gates PB7 and PB8. Security guards or transport personnel at Goods Inwards can help direct you to the correct gate.
Transportation gate dimensions:
Hall BA
PB1 4,20 x 4,85
PB2 4,20 x 4,95
Hall BB
PB3 5,50 x 5,14
PB4 2 x 1,75 x 2,10
PB5 2 x 1,75 x 2,10
PB6 4,10 x 4,85
Hall BC
PB7 4,00 x 4,40
PB8 2,95 x 2,60
Link to hall drawing, Hall B
Hall C
The sections of Hall C
Hall C is divided into three sections: CA, CB and CC. These sections have different technical data which is reported for each section. For detailed information on the pillars, please contact Event Services, tel. +46 (0)8-749 44 44.
Hall CA
From floor to ceiling
The concrete floor, painted grey, can withstand a maximum load of 400 kp/m2. The ceiling height is 4.1 m. Along the hall's walls, the ceiling height can be significantly lower. Section CA has 15 supporting pillars.
Electricity and water, heating and sanitation
Connections for water, drainage, compressed air and power points are via service channels in the hall ceiling.
Transportation
Transport and deliveries are directed to gates PC1 and PC5. Security guards or transport personnel at Goods Inwards can help direct you to the correct gate.
Halls CB and CC
From floor to ceiling
The concrete floor, painted grey, can withstand a maximum load of 1,000 kp/m2. The ceiling height is 7.2 m at its highest point and 4.3 m at its lowest point. Along the hall's walls, the ceiling height can be significantly lower. Section CB – CC has 24 supporting pillars.
Electricity and water, heating and sanitation
Connections for water, drainage, compressed air and power points are via service channels in the floor. The position of the service channels is normally indicated by two dotted lines on the drawing of the proposed position.
Transportation
Transport and deliveries are directed to gates PC2 - PC3. Security guards or transport personnel at Goods Inwards can help direct you to the correct gate.
Transportation gate dimensions:
Hall CA
PC1 3,30 x 4,04
PC5 3,30 x 4,10
Hall CB-CC
PC2 6,50 x 4,04
PC3 6,50 x 4,04
Link to hall drawing, Hall C
Victoria Hall
From floor to ceiling
The floor comprises natural stone and withstands a maximum load of 2,000 kp/m2. Part of the hall has an upper level, and both levels are connected by a staircase. The upper level floor comprises concrete blocks and can withstand a maximum load of 400 kp/m2. The height in the hall varies between 4.3 m and 6.9 m. Along the hall's walls, the ceiling height can be significantly lower. There are limited opportunities for suspending wires. Please contact Event Services, eventservice@stockholmsmassan.se, for guidance.
Power and water, heating and sanitation
Connections for water, drainage, compressed air and power points are via service channels running along the outer walls of the hall. There are limited opportunities for connecting to the drainage system. Please contact Event Services for more information.
Transportation
Transport and deliveries are directed to gates PV1 and PV2 for the lower level and gate PK1 for the upper level. Security guards and transport personnel can help direct you to the correct gate.